Updated Virtual Machines for TFS and Visual Studio 2010

The evaluation VPCs Microsoft kindly provides us will soon expire (on December 15). To our rescue Brian Keller has updated the virtual machines for Hyper-V, Windows 7 and Virtual PC 2007 so that it will run for another six month (next date to be aware of is June 1 2011).


You can download the images from the following locations:



If you want to know more about what’s available in the VPC, check out Brian’s post Visual Studio 2010 RTM Virtual Machine with Sample Data and Hands-on-Labs.